Beacon Machine Manufacturing Co.,ltd

TEL/Whatsapp/Wechat:0086-18253885135E-MAIL: info@beacon-machine.com
Your current location:Home >Products >Common rail injector tester / Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring
  • Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring
  • Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring
  • Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring
  • Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring

Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring

This is a common rail injector piezoelectric injector tester that can be used for AHE dynamic lift travel and with flow meter for Siemens

0086-18253885135

info@beacon-machine.com


Make an inquiry

Beacon Machine CRI250 Piezoelectric Injector Analyzer with Dynamic Stroke Monitoring



WhatsApp: https://wa.me/+8618253885135

1.Function introduction

The following parameters can be measured

a.Piezo crystal resistance;

b.Piezo crystal capacitor;

c.Insulation resistance of piezo injector

d.Piezo crystal dynamic lift;

e.Drive piezo injector. 

2.Instructions

A.Front view 


1. ON/OFF Knob

a.Press the ON/OFF knob

Run or stop,

The lower right corner of the screen shows the current status:ON/OFF; 

b.Turn the ON/OFF knob left and right:

In mode 1, 3, 4, adjustable voltage value: 0 178V;

In mode 5, the pulse width can be adjusted; 0 5000us

2. MODE Knob

1. Press the MODE knob: Enter the submenu, or return to the main menu

2. In mode 5 rotate the MODE knob left or right to adjust the injection frequency

1 100Hz;


B Back view: 



Power socket: AC: 100-240V;

Piezo injector drive harness; 


3.Warranty Policy

Anormal use, due to product quality problems, free maintenance within one year;

BIf the product is damaged due to abnormal use,

the user shall bear the cost of maintenance;

Cproduct lifetime maintenance, beyond the warranty period,

the user bears the cost of maintenance costs.



Back

Make an inquiry