HP-C hydraulic cylinder test bench hydraulic test bench for hydraulic pumps

样本:点击下载

1.Environment of test bench placed

The test bench must be installed in a house that is dry, transported from corrosive gases, and is not susceptible to wind and sand. The ambient temperature is generally at 5-35 °C.


2.Installation of the test bench

The test bench must put the vibrating rubber pads on the horizontal ground, and there should be a certain space around the test bench for easy operation.


3.Power distribution of the test bench

Power requirements: Three -phase and four -wire 380V/Hz, the four -core cable of the power line, matching the cable size according to the main motor of the test bench.

Allow voltage fluctuations: -15%-10%

Frequency fluctuation: 5%


4.Hydraulic oil selection of test bench

Oil standard: Inject ISOVG46 anti -wear -resistant hydraulic oil that meets technical requirements.

Hydraulic oil volume: 100L, customized according to the test bench.


5.The wiring steps of the test bench:

First, the cable is led to the test Taipower valve through the ditch or the sheeping tube, and the cable is pushed to the bottom of the bottom plate of the pilot panel through the test platform to the test bench. The root line is pressed to the wiring terminal R, S, T, O, and "e" must be reliable.


6.Requirements for fuel injection of fuel tank:

(1) The fuel tank must be cleaned before hydraulic oil is injected into the fuel tank;

(2) The hydraulic oil must be strictly filtered before the fuel tank is injected. The mechanical impurities contained in the oil should be controlled within 0.05mm;

(3) The hydraulic oil level is more than 2/3 of the oil label, and it is displayed according to the liquid level.

Remarks: Check the voltage oil level before booting, and add it in time; pay attention to the high -pressure filter should be cleaned or replaced in time, and it is usually cleaned once in half a year.


7.Power -powered debugging test bench host

The other end of the three -phase and four -line cable (there must be a three -phase and four -wire plug). After the automatic protection switch is connected to the grid, the automatic protection switch is closed to the test platform to send electricity.

According to the direction of the hydraulic pump installed, select the switch at the main axis of the test bench, and select the appropriate spin.


8.Connection of hydraulic pump pipeline:

(1) First select the appropriate bracket or coupling of the hydraulic pump, fix it on the work table

(2) The equipment oil supply pipe is connected to the hydraulic pump to synchronize the return to the oil pipe; pay attention to the accuracy of the pipeline

(3) When the gas source blows away or clean, use the gas source nozzle


9.All connections are completed and can be tested normally.

10.The debugging is over, so that the test bench can be put into use.

  • 1

    艾能空压机种类、规格齐全

    艾能压缩机是高效、品质卓越的,凭借雄厚的技术力量和丰富的制造经验,艾能螺杆压缩机品种及规格齐全,能够满足不同用户对气体品质、气量大小、使用工况等的不同要求,主要产品有:固定式螺杆空压机、双级压缩永磁变频空压机、变频空压机、永磁变频空压机、低压力螺杆空压机、工程用移动式螺杆空压机、蜗旋式螺杆空压机、矿用移动式螺杆空压机、无油螺杆空压机、无油中高压压缩机等等。对特种行业或特殊要求,艾能公司更擅长按照用户要求定制特殊的压缩机。
  • 2

    艾能空压机工艺先进、品质杰出

    凭借其丰富的经验及不断创新的技术,成为全球重要的螺杆空压机供应商。在德国AERZEN公司的支持下,以及与德国著名ROTORCOMP、GHH-RAND公司的合作,使艾能空压机更上一个台阶。其卓越的主机设计,几十年的实践证明具有极其优良的性能。
  • 3

    艾能公司保持德国工业的精湛技术

    采用德国技术,精益求精,制造的空压机极具竞争优势,广泛应用于各行各业:石化、纺织、钢铁、煤矿、水电、工程、医疗、水泥(建材)、电子、机械、汽车、食品等等,艾能空压机在中国市场已拥有良好的品牌信誉,满足了工业界对高可靠性、高效率、低能耗压缩机的需求。
  • 4

    艾能基于“用户至上”的策略

    艾能公司在制造一流空压机的同时,更广泛提供售前和售后服务---快速、可靠、革新,以期最大程度上满足用户需求。智胜公司继续为全国范围的用户提供专业、周到、快捷的服务。
上一个:YLD-16A Fan Blade Pump Impeller Vertical Dynamic Balancing Machine
  • 下一个:YF-5 industrial dynamic balance vertical single plane rotor balancing machine for flywheel
  • 联系我们

    电话:0086-18253885135

    一键拨打

    地址:High Tech Industry Zone of East Tai an city,Shandong Province,China

    地图导航

  • 电子邮箱:

  • 联系地址:

  • 留言内容:

  • 留言时间:

  • 首页公司简介产品中心联系我们