After receiving the goods, open the packing box, please check immediately whether the items in the packing box are consistent with the packing list. If any items are missing, please contact the after-sales service personnel in time.
If the test system is in good condition and the accessories are complete, follow the steps below.
2 Check the input power of the device before connecting to the power supply. The power cord of this equipment is three-phase five-wire 380V, please ensure reliable grounding; if the power supply voltage is unstable, please use a power supply voltage stabilizer.
3 Add special test calibration pump oil for fuel injection pump